Skip to content Skip to left sidebar Skip to footer

Notices

Further abnormal load movements to HPC on 10th and 17th November 2024

There are further planned dates for the transportation of equipment from Combwich Wharf along the C182 to the Hinkley Point C construction site.

They will be moving equipment over the course of two days, at the following dates and times:

–   Sunday, 10 November between 09:00 – 10:00 and 11:00 – 12:00

–   Sunday, 17 November between 08:30 – 09:00 and 11:00 – 13:00

Due to the size and shape of this equipment, these deliveries will be managed via an escorted ‘rolling roadblock.’

If you wish to find out further details please email: edfenergy@hpcenquiries.com or call  on 0333 009 7070.

Road Closure – Wick Lane, Wick 5th to 8th November 2024

Please be aware that we have received a notification of an urgent road closure at Wick Lane, Wick which will commence on 5th November 2024 – 8th November 2024 (00:00 – 23:59) for a total of 4 days.

This will enable Wessex Water to repair leak.

The contractor has indicated that access for Emergency Services through the site is not permitted on this occasion.

For any further information about this closure please contact Wessex Water on 0345 600 4600, quoting reference: ttro284099W(WS)

Please visit one.network https://one.network/?tm=140841059 where you will see the map of the affected area (in red), together with the supplied diversion route (in blue).

Further Abnormal Load movements on the Hinkley Point Road (C182)

Further transportation of equipment from Combwich Wharf along the C182 to the Hinkley Point C construction site will be taking place on the following dates and times:

–   Thursday, 31 October between 11:00 – 12:00 and 14:00 – 15:00

–    Saturday 2 November between 09:00 – 12:00

 

Due to the size and shape of this equipment, these deliveries will be managed via an escorted ‘rolling roadblock.’

If you wish to find out further details please email: edfenergy@hpcenquiries.com or call on 0333 009 7070.

Road Closure – High Street, Stogursey November 18th to 20th – 0930 to 1530 hours

Temporary Road Closure: ttro785147W(WS) –  High Street, Stogursey

Please follow the link to view the above road closure; https://one.network/?tm=139982887 and the link for the Notice 2:https://api-gb.one.network/downloads/tm/1111/03-notice-2_139982887_3809807_36816aaa52.pdf           

The order becomes effective on 15th November 2024 and will remain in force for eighteen months.

The works are expected to commence on 18th November 2024 and last for 3 days (09:30 – 15:30) to enable Openreach to lay duct.

The contractor has indicated that access for Emergency Services through the site is permitted on this occasion.

For any further information about this closure please contact Freeflow Traffic Management on 0800 085 9194, quoting reference: ttro785147W(WS).

Notification of equipment transportation along the C182 Hinkley Point Road 24th and 27th October 2024

Abnormal Load movements Combwich to HPC – October

Further planned dates for the transportation of equipment from Combwich Wharf along the C182 to the Hinkley Point C construction site have been announced.

They will be moving three pieces of equipment over the course of two days, at the following dates and times:

–    Wednesday, 16 October: between 12:00–13:00 and 14:00–15:00

–    Sunday, 20 October: between 09:00 and 16:00

Due to the size and shape of this equipment, these deliveries will be managed via an escorted ‘rolling roadblock.’

If you wish to find out further details please email: edfenergy@hpcenquiries.com or call us on 0333 009 7070, the Hinkley Point C Community Relations Team